Modern Architectural Structure

WELCOME TO OUR PROJECT PORTFOLIO!

We take pride in every project we undertake, from small-scale renovations to large, complex build-outs.

​

This page showcases our diverse expertise through a collection of completed projects, each highlighting our commitment to quality, innovation, and client satisfaction.

​

Browse through our portfolio to see how we’ve brought our clients’ visions to life with precision and care.

FEATURED CLIENTS

At the heart of our business is a commitment to long-term client partnerships.

Greater Dental Health
Peachtree Corners, GA

Carter Construction Partners proudly provided Design/Build services for the interior build-out of an upscale dental office in Peachtree Corners, GA. The project was successfully designed, permitted, and completed within just five months. One of the most significant challenges was coring thirteen (13) 3"-5" holes through an existing slab located above an active tenant. This required careful coordination to run utilities to eight operatory rooms, new plumbing installations, and newly constructed restrooms.

Salon Greco
Suwanee, GA

Carter Construction Partners was honored to serve as the general contractor for the tenant build-out of Salon Greco, a European Day Spa, in Suwanee, GA. The project featured the installation of hair stations, shampoo bowls, a nail station, and massage and facial rooms, creating a luxurious and functional space for clients. Our greatest challenge was completing the design, permitting, construction, and securing the Certificate of Occupancy within a tight timeframe, as the owner's lease was set to expire in just a few months. We are proud to have been entrusted by the owners to deliver this project on schedule and thoroughly enjoyed bringing their vision to life!

Atlanta Public Schools

Interior Refresh

Carter Construction Partners was honored to manage a comprehensive renovation project that included select interior demolition, painting, ceiling tile replacement, select flooring replacement, installation of new HVAC diffusers throughout, and the addition of a new HVAC split unit. The scope of work also included building pressure washing to ensure a refreshed and polished appearance. We are proud to have delivered these improvements with precision and care, enhancing the functionality and aesthetics of the space.

Creekland Middle School

Carter Construction Partners recently completed the demolition of 65,000 square feet of existing ceiling tile and grid. Following the new HVAC installation, we then installed all new grid and ceiling tiles. Our work also included painting angles, hangers, conduit, junction boxes, gas piping, ductwork, and flashing.

 

This project required extensive coordination with mechanical, electrical, fire protection, and fire alarm teams. The overall project involved significant HVAC upgrades, with Conditional Air, Inc. serving as the prime contractor.

 

Our primary challenge was to complete the project within an eight-week accelerated schedule, ensuring seamless coordination with all other subcontractors, while maintaining our commitment to safety and quality

Slam Academy of Atlanta - Elementary School

Carter Construction Partners recently completed a project involving the conversion of 2,565 square feet of dry storage warehouse space. This conversion successfully expanded the existing cafeteria and created a new corridor. Additionally, we transformed a 1,600-square-foot student laboratory into two new classrooms, along with an additional storage room and classroom.

The scope of work for this project included interior renovations, mechanical system upgrades, and demolition. Our team was responsible for the installation of mechanical, electrical, fire alarm, and sprinkler systems, as well as metal framing, drywall, acoustical ceilings, flooring, doors & hardware and painting.

Our primary challenge was to complete this project before the start of the school year, especially given the late award over the summer. Despite the tight schedule, we successfully delivered the project on time.

Garden Hills Elementary School, APS Project

Carter Construction Partners recently completed a project at Garden Hills Elementary School that encompassed a variety of interior scopes. Our work included full interior painting, the installation of 4-inch rubber base flooring throughout the interior, and the demolition and installation of 12,000 square feet of grid and acoustical ceilings. We also built shelves in classrooms, cut existing walls to frame 16x16 transfer holes above classroom ceilings, installed new drywall soffits with new ceilings, constructed chase walls for new HVAC ducts, and performed vinyl ceramic tile repairs.

 

Our primary challenge was coordinating all trade partners and ensuring the entire scope of work was completed within the project's timeframe. We appreciate Max Air Inc., the prime contractor, for entrusting us with all the interior finishes required for this project.

Gwinnett County Park

Athletic Field Park Project

Shorty Howell Park – Bleacher Installation Project

We were proud to partner with Gwinnett County on the Design/Permit/Build of new aluminum bleachers for Shorty Howell Park. The project included the installation of elevated 5-row home and visitor bleachers with square tube and angle frames, accessible ramps, wheelchair and companion seating, intermediate steps, handrails, and picket-style guardrails—providing seating for 502 spectators, including 12 ADA-accessible spaces. Despite schedule constraints and weather challenges, our team delivered the project on time, just in time for the park's first football game. This project reflects our commitment to trust, quality, and accountability in every build.

Towns Elementary School (APS)

Our team successfully executed a variety of interior scopes at APS Towns Elementary School, including:

​

  • Replacement of 64,000 square feet of 2x2 ceiling tiles, along with necessary grid repairs and adjustments.

  • Installation of 2,452 square feet of Armstrong Tectum Direct attached ceiling grid system and wall sound panels in the gym area.

  •  Interior framing for the new vestibule wall storefront system.

  • Metal stud reframing to accommodate the new restroom layouts.

  •  Installation of blocking for new restroom accessories.

  • All associated drywall and finishing work, including patching, mudding, and the repairs of drywall soffits.

  •  Fire caulking for all above-ceiling penetrations in the corridors.


The primary challenge we faced was adapting to multiple schedule revisions throughout the project. Despite these changes, we successfully completed the entire scope of work within the allotted project timeline.

Cascade Elementary School, APS Project

Carter Construction Partners recently completed a project that involved a variety of interior and exterior finishes. Our scope of work included the installation of VCT flooring in all classrooms, rubber base flooring throughout the school, and luxury vinyl tile in the principal and front office areas. We also installed carpet in the media center, door stops on all classroom doors, and performed interior painting throughout the school. For the exterior, we handled interior and exterior signage, exterior stucco repairs, parking lot sealing and striping, landscaping, and painting of exterior site light posts.

 

Our main challenge was coordinating all trade partners and completing the entire scope of work within the project's timeline. We were grateful to Max Air Inc., the prime contractor, for entrusting us with all the interior and exterior finishes required for this project.

Clayton County, Prefabricated Restrooms - Multiple Locations

Carter Construction Partners recently completed a project at Independence Park, Grant Park, and Bonanza Park, which included the installation of prefabricated restrooms, grading, utilities, and foundation preparation and ADA concrete sidewalks . We were directly responsible for the prefabricated restrooms and coordinating with Clayton County on layout and site preparation activities.


Our primary challenge was managing the different site conditions at each location and coordinating these aspects with the county throughout the permitting and installation processes.


We appreciate Clayton County entrusting us with our role during the construction process.

NCM Expansion

NORCROSS, GA

NCM Retail Expansion – Norcross, GA

Carter Construction Partners was proud to lead the 4,000 sq. ft. expansion project for NCM in Norcross, GA. We transformed an old office space filled with cubicles into a new retail store that helps provide clothing and household items for homeless families. One of the biggest challenges was cutting through a thick, fire-rated concrete block wall to install new double doors. Our team safely supported the wall, reinforced the area, and installed the new doors and hardware. This project reflects our commitment to trust and quality, while building credibility and delivering a unique identity that helps us stand out in a competitive market.

Gwinnett County Water Reclamation Facility

Project For Gwinnett County

Insulated Panel Conditioned Storage Room – Maintenance Warehouse

Carter Construction Partners completed the build of a climate-controlled storage room within an active maintenance warehouse. The project included installing insulated wall panels, ceiling grid and tile, HVAC units, and tying into the existing electrical and fire sprinkler systems. We also installed a new circuit breaker, emergency disconnect, and condensate drain line. Additional work included relocating and adding fencing, installing new and existing shelving, applying yellow safety striping throughout the warehouse, and placing protective bollards. We also handled the relocation of materials during construction. This project demonstrates our ability to manage complex upgrades with trustworthy execution, high-quality standards, and the dependability our clients count on to keep their operations running smoothly.

Demolition

City of College Park

Complete Demolition and Asbestos Removal Project

Carter Construction Partners successfully completed a full demolition project, which began with the safe removal of asbestos from the site. The scope of work included tearing down the entire structure—walls, floors, and foundation footings—as well as removing patio and porch slabs, concrete walkways, fencing, steps, shrubbery, and any other remaining structures on the property. Every phase of the demolition was handled with care, safety, and precision. This project reflects our credibility in handling sensitive site conditions, our commitment to quality and safety, and our ability to deliver clean, reliable results that prepare sites for their next chapter

Commercial Greenhouse

Climate-Controlled Greenhouse Build

Carter Construction Partners completed the construction of a 28’ x 48’ climate-controlled greenhouse, totaling over 1,300 sq. ft. The project included a full ventilation and cooling system with low-volume intake shutters, power vents, evaporative cooling, and a heating system for year-round functionality. We installed horizontal air flow fans, environmental controllers, irrigation systems, and utility connections for both plumbing and power. The build also included secure door installation and durable roof covering. This project showcases our expertise in specialized construction, our commitment to quality performance, and our reliable approach to delivering purpose-built environments tailored to our clients’ unique operational needs.